| Orario |
Titolo intervento/Paper |
Autori |
| 9.45 - 10.15 |
The improvement of operational reliabilty in a process industry |
Filipe Pereira Rui Canuto, Polytechnical Institute of Setubal, Portucel Soporcel - PORTUGAL |
| 10.15 - 10.45 |
A proposed methodology for decision support on ageing systems |
S.L. Isaksen - DNV Energy - NORWAY |
| 11.15 - 11.45 |
Next-generation predictive maintenance based on integrated condition monitoring technologies |
Frank Kirschnick, Martin Grasmeder Cassantec - SWITZERLAND |
| 11.45 - 12.15 |
Calculation of preventive maintenance tasks using RCM method |
V. Stuchlý, J. Grencik - Un. of Zilina - SLOVAKIA |
| 13.30 - 14.00 |
Conditions monitoring to improve maintenance strategies in a chemical plant |
G. Adriani, A. Giannoni, M. Grassi - Mecoil, Ineos Rosignano - ITALY |
| 14.00 - 14.30 |
Criticality Assessment and Reliability Centered Maintenance (RCM) Analysis approach by use of Norsok Z008 and IEC 60300-3-11 |
Terje Nilsen, Nicholai Christensen Scandpower - NORWAY |
| 14.30 - 15.00 |
Maintenance Engineering and predictive Maintenance development plan on high criticality equipment |
Severino Marchetti - Ise - ITALY |
| 15.00 - 15.30 |
Optimal overhaul interval for marine high-speed diesel engines - A case study |
Alf Harlem, Magnus Rasmussen - Vestfold University College - NORWAY |
| 16.00 - 16.30 |
How to optimize a lubrication plan and energy conservation through the ultrasound |
M. Felli - UE-System Inc. - ITALY |
| 16.30 - 17.00 |
Predictive and proactive maintenance return or investment. Case study |
Fabrice Brion I-Care International - BELGIUM |
| 17.00 - 17.30 |
New possibilities-Next generation robotic systems for inspection and maintenance operations |
A. Transeth, S. Fjerdingen, P. Liljebäck, E. Kyrkjebo, T. Mugaas - SINTEF ICT - NORWAY |